When to saw control joints concrete construction magazine. These joints are typically not as deep as those obtained by the conventional sawcut process, but should be a minimum of 1 inch 25 mm in depth. Aug 29, 2016 they are the saw cut joints we cut into concrete slabs to control cracking as the concrete cures. Jan 15, 2016 control joints also called contraction joints are placed in concrete slabs to control this cracking. Contraction joints are often called control joints. I knew that they didnt cut any control joints, but i thought that i could either just do it myself or hire someone else to do it sometime later. In the photo at left is a tooled control joint in a concrete floor slab. How and when to make a control joint cut in concrete. Contraction joints in concrete slabs the concrete network. Control joints in concrete slabs control the location and extent of cracking. Contraction joints are used in slabsonground to create weakened planes that limit the frequency and width of random cracks caused by volume changes due to restrained drying shrinkage, ther. Sawcut creates weakened plane inducing crack below. If a crack develops before the concrete is sawed, the sawed joint will be ineffective. Aug 16, 2014 how to saw cut concrete shows how to cut concrete primarily to create ornamental, modern scoring in concrete.
Apr 17, 2018 in general, saw cut joints should be installed as soon as the concrete is sufficiently hard to resist tearing and raveling and before random cracking occurs. It shows some finished examples and the step by step method. Contraction control joints are placed in concrete slabs to control random cracking. In summary, although saw cutting is sometimes used as a means of controlling cracking of composite slabs, there is considerable risk with saw cutting, and the process requires a high level of supervision on site. Earlyentry drycut joints are generally run 1 to 4 hours after completion of finishing, depending on the concretes setting characteristics. Jul 05, 20 the problem is, most pictures or samples fail to accurately represent the necessary steps to control cracking. As shrinkage begins to occur before the development of significant strength, it is critical to install saw cut contraction control joints early to avoid random cracking. You can use an earlyentry saw to cut a joint as soon as the concrete is hard enough to walk on. The overall tendency is to shrink and this can cause cracking at an early age. Concrete construction joints are formed using some sort of wood, steel, or plastic bulkhead. Mar 01, 2018 the guys that i hired did not cut any control joints aka contraction joints. Control joints are tooled or sawn to a depth of about onethird the depth of the concrete. Contraction joints placing contractioncontrol joints in concrete flatwork. Since this concrete has now gone 30 days of curing, is there any purpose to cutting control joints now.
A fresh concrete mixture is a fluid, plastic mass that can be molded into virtually any shape, but as the material hardens there is a reduction in volume or shrinkage. Sawcuts in precast concrete topping structural engineering. In other words, if the concrete does crackyou want to have an active role in deciding where it will crack and that it will crack in a straight line instead of randomly. Saw cutting cuts joints as soon as the concrete is hard enough that the edges.
If you have any questions regarding control joints or other concrete cutting topics, please contact cobra concrete cutting services co. In hot weather, concrete may crack if joints are not cut within 6 8 hours after finishing. Tips for placing control joints in concrete slabs including information about depth. Concrete control joints proper spacing, depth and timing.
There is a big problem with control joints or contraction joints. Joints are an effective way to control cracking due to shrinkage. Most of the time we saw the joints using an early entry soff cut saw. Sawcut joints in the same location as handtooled joints. Now lets talk about what are arguably the most important type of jointscertainly the most likely to cause problems. Rules for designing contraction joints for construction pros. How to evaluate cracks at control joints or expansion. Concrete poured and no control joints cut too late now. Concrete control joints how to minimize cracking in.
Concrete cracks and control joints construction consumer. Cracking occurs beneath the sawed slot when the shrinkage stress exceeds the tensile strength of the concrete. Or you can use a standard saw to cut in joints 24 to 72 hours after the concrete is poured. The problem is the floor owner typically wants the floor poured, joints cut, joints filled, and building occupied in 60 days or less. At the beginning of the time window for sawing, make a sawcut in the slab. Aug 28, 20 control joints purposefully weaken the slab at designed locations to control the cracking, but of course, not completely. Contractioncontrol joints are placed in concrete slabs to control random cracking. Control joints are not intended to stop cracking but rather control cracking it is best to cut joints as early as possible either while finishing with a concrete groover or within 618 hours after finishing with a concrete saw. In commercial construction, control joints are often formed by saw cutting and this should take place within the first 46 hours after placement, or as soon as you can walk on the slab and saw cut without dislodging any.
In small slabs, like patios or sidewalks, control joints can be troweled in by hand during the finishing process. Unless you use concrete control joints the cracks will be random. They reduce the risk of random cracking by forcing the concrete to crack in vulnerable areas. Saw cuts are a means of creating joints in concrete. As the name implies, saw joints are cut with a saw saw cut shown in above image.
Control joints are provided in a concrete slab to reduce cracks formed due to shrinkage. The ruler of thumb is, cut joints as soon as the concrete is hard enough that the edges dont ravel dislodging the aggregates by the saw blade. Joints are installed at prescribed intervals to determine where cracks occur. Control joints are planned cracks which allow for movements caused by. Properly placed joints will concentrate cracking along the joint line, and reduce the potential for random cracking throughout the slab. Slabs crack directly beneath saw cut contraction joints and transfer load between panels by aggregate. Earlyentry joint saw cutting provides benefit texas curb cut. Guide to cutting relief joints in concrete bartell global content hub.
Jul 04, 2006 according to sullivan, there are three methods to cut in control joints. Control joints can be repaired with concrete mender. Nov 02, 2016 check out our quick guide to help you control cracking in your slab. Q we are having trouble with slabs cracking before we saw the control joints. Some control joints are dummy joints, placed to balance the specified joints aesthetically. You can hand cut a joint with a groover while the concrete is still wet. Sawcutting joints in concrete concrete construction magazine. Preventing random cracks in concrete specify concrete. After cutting 18to 316inchwide control joints, the saw cut edges of the slab require serious protection. The current project is 10 hollowcore precast plank with 4 structural, 4,000 psi concrete topping. The general contractor wants to know where to put their typical 14 wide x 1 control joint cuts in the precast concrete topping. Concrete cures hard in typically 28 days, but it continues to shrink and crack for a about a year.
Control joints are planned cracks which allow for movements caused by temperature changes and drying shrinkage. He recommends using no contraction joints, allowing random cracks to form, and patching only those that affect the serviceability of the floor. Cutting and grooving as with any concrete surface, your most obvious way to control cracks is to cut control joints. In hot weather, concrete might crack if joints are not cut within 612 hours after finishing concrete. Ascc contractors will saw cut elevated slabs if required by project specifications. Irregular cracks are unsightly and difficult to maintain but gen erally do not affect the integrity of concrete. With conventional wet saws, you can usually start to cut joints 4 8 hours after finishing. Placing joints in concrete flatwork why, how, and when.
However, there will be less aggregate interlock with a deeper joint. Ive now done some searching and reading on control joints. How to saw cut concrete shows how to cut concrete primarily to create ornamental, modern scoring in concrete. When you see a crack or joint that is formed in a straight line, dividing poured concrete into sections, most likely its a control joint. Saw cutting cuts joints as soon as the concrete is hard enough that the edges abutting the cut dont chip from the saw blade. Joints need to be cut after the concrete has achieved enough strength to keep it from raveling, but before internal stresses in the concrete become. Check out our quick guide to help you control cracking in your slab. The other option is to sawcut the control joints after the concrete has cured enough to. Saw cuts are a used to create control joints in concrete, which help control where cracking occurs due to shrinkage.
Sometimes concrete cracks before the saw can cut the joint without causing raveling. Saw cut joint vs tool joint for modern exposed concrete floors. Factors such as concrete mix, weather conditions, hardness of concrete and types of machines used for making the control joints determine when to cut the concrete slab. How to evaluate cracks at control joints or expansion joints. Placing control joints in concrete the concrete network. Once cracked assess what the crack will do leave as they are, better not to fill. This method is not recommended and we would advise using reinforcement to control cracking. Using this equipment, you can place concrete in the morning, then cut the slab during regular working hours the same day. Avoid cracks by cutting control joints in concrete mastercut. A concrete joint and its filler material undergo many stresses during the curing period of new slabs and that continues during its service life with ongoing shrinkage, thermal cycling, and traffic loads. The time when the concrete slab is saw cut to make control joints is an important aspect for the efficient use of control joint. How many days should i wait after a pour for cutting concrete.
Even with minor cracks outside of a joint, you can expect significantly less cracking in a poured slab if control joints are cut with the proper spacing and depth. Most of the time we saw the joints using an early entry soffcut saw. Using a longhandle lightweight drycut saw will allow joints to be cut almost immediately after finishing. Meeting the demand for crack control in stamped concrete. If you work with concrete you need to know how to make concrete control joints. Will act as a saw cut, leave till the end of the project.
Theyre important in that they allow you to control any cracking that might occur in the concrete youve laid sue to changes in temperature. Control joint cuts are also made once the concrete is poured using a concrete saw, whereas an expansion joint is a predetermined gap created. The next thing that we are going to look at is the proper depth for cutting your concrete control joints. Ive installed thousands of lineal feet of control joints in my concrete floors. Concrete construction joints how to minimize cracking in. If using a saw to cut the joints, the cuts should be made as soon as the concrete can withstand the sawing without raveling the edges of the saw cut.
The concrete contractor, however, is not responsible if all cracks dont form in these contraction joints. Properly positioned and use of free movement joints. Often times people will cut their floors and not cut them deep enough which of course will result in random cracking. Historically, conventional wet cut saws were used to install joints the day after concrete placement.
Saw cutting of composite slabs to control cracking. They are the saw cut joints we cut into concrete slabs to control cracking as the concrete cures. Apr 14, 2014 concrete expands and contracts and can crack or should i will crack eventually and if you put control joints in them, you can reduce the amount of them and even redirect the cracks along these. For wetcut sawcut joints, depth of the contraction joint should be 14 the slab thickness or a minimum of 1 inch. We are having trouble with slabs cracking before we saw the control joints.
Concrete expands and shrinks with changes in mois ture and temperature. For large pours or long narrow pours, like sidewalks, installing construction joints at preplanned locations will help minimize random cracking in the concrete. In these cases, consider using a lightweight saw that allows you to cut within a few hours after final concrete finishing. To ensure joint activation or cracking, sometimes a sawcut depth of the slab thickness is specified. Ive been in the concrete floor business for over 30 years. Concrete, when drying, has a natural tendency to shrink. Control joints attempt to specify the route of the cracking by proactively creating a weak point in the slab. Concrete expands and contracts and can crack or should i will crack eventually and if you put control joints in them, you can reduce the amount of them and even redirect the cracks along these. By the time the slab was ready for a conventional wet cut, shrinkage.
Correct location of saw cuts and construction joints. In any large slab, however, saw cuts should be used. The cut is not actually made the entire way through the slab but only at onequarter the depth of the concrete. Before we start sawing, there are already some cracks in the slab. The time when the concrete slab is sawcut to make control joints is an. This method allows us to saw the relief cut very soon after we are done troweling. Since all concrete floors are subject to cracking, control joints or contraction joints should be placed in fresh concrete to create weakened planes that control the severity and pattern of cracks. Earlyentry saws are available which may allow cutting to begin within a few. Concrete control joints may also be cut by a power saw if they were omitted during the original pour.
The cuts should be made at a predetermined spacing and only after the concrete has obtained sufficient strength but before internal cracking begins. Our procedure is to place the concrete slab, then come back the next morning to saw the joints. Occasionally, however, project specifications require contractors to saw cut contraction joints in elevated slabs. In general, saw cut joints should be installed as soon as the concrete is sufficiently hard to resist tearing and raveling and before random cracking occurs. In general, joint spacing to control drying and thermal shrinkage should range from 12 to 25 feet in unreinforced and lightly reinforced floors. Both isolation and construction joints are formed before the concrete is poured.
877 1104 1445 934 1432 736 57 1109 106 140 313 1131 1406 131 519 493 1354 1178 30 903 733 312 12 1480 967 882 975 755 700 645 724 608 972 841 577 1158 415 1395 572 1143 1318 493 462